Nansha Seaport area of 223 hectares, with six berths 150,000 tons, 2100 meters long coastline, water depth of -15.5 meters, 250 meters wide fairway, fairway length of 35 sea miles, basins and a width of 600 meters, to meet the world's largest current container ship berthing operations. In 2014, sea giant "US Dumas Maersk" 3E type 18000TEU ship loading capacity of 19100TEU of the world's largest container ship "Sea World" has anchored Nansha harbor company, marking the Nansha harbor loading and unloading capacity of the world's top level. Nansha harbor bridge in efficiency when operating 43MPH to the bridge when the operating efficiency 49.2MPH "Da Feika door", respectively, topped the first 48 weeks of 2012, 18 in 2013 when Zhou Dafei global efficiency charts Harbour Bridge, 2014 annual operating Maersk Line "Park efficiency" compliance rate was 108.1%, ranked second in the Far East 13 harbors.